CASE STUDIES

TRACKSIDE CIVILS (HV SUPPLY) DNO BASES & DUCTING CASE STUDY

H&A Rail Ltd secured the winning bid to install new RC concrete bases, ducting, NEW TRAIN EV CHARGING POINTS, and STAKKA boxes. This project was part of a multi-million-pound scheme to install
a new HV power feed to existing sidings.

​

Working in collaboration with our key client and valued supply chain we completed all works with no accidents or incidents.

​

Another project that H&A Rail delivered to design, with superb effort all around from our dedicated team.

PLATFORM RESURFACING PROJECT CASE STUDY

H&A Rail Ltd was successful in winning a bid to resurface 6 Platforms on 3 major London Northwest stations, within a 6 day blockade in Dec 2022.


Working in collaboration with our key client and valued supply chain we completed all works with no accidents or incidents.


A major job successfully completed, within a set time constraint, and a happy client at the end of the project.

UNDERBRIDGING WALES & WESTERN ROUTE OXFORD CASE STUDY

H&A Rail were approached to self-deliver all package of works.

​

  • Completed 600m2 of de-vegetation across two locations (either side of the bridge).

  • Completed all trial holes.

  • Removed all old handrail and ballast retention.

  • Supplied and installed 100 linear meters of key clamp handrail.

  • Supplied and installed 100 linear meters of newballast retention.

  • Completed 80m2 of brickwork repairs.

  • Supplied and installed new 2.4m high palisade fence and gate.

  • Installed new access point sign.

  • Supplied and installed weed suppressant fabric on the embankment.

STRUCTURAL INTEGRITY WORKS (5 BRIDGES) CASE STUDY

H&A Rail Ltd secured the winning bid to complete structure and integrity works as part of the underbridge strengthening and refurbishment scheme in Wessex.

​

We were awarded all 5 locations to complete de-vegetation, specialised repointing, replacements of brickwork and large areas of structural re-casing.

​

All works were successfully delivered and signed off to NR standard for masonry repairs and delivered in collaboration with our key client and valued supply chain.

PADDINGTON STATION REB CASE STUDY

Our client approached H&A Rail to support them through this exciting civil project.

​

  • Supplied and installed 16 new pad stones to receive new steels.

  • Completed all new brickwork as per design.

  • Supplied and installed 80 linear meters oftech GRP troughing.

  • Supplied and installed 80 linear meters of GRP yellow handrail.

  • Supplied and installed four new LOC bases.

  • Supplied and installed 5 tonnes of new pea shingle.

  • We removed over 50 tonnes of old material from the site.

  • Liaised with the station manager.

AFA SCHEME PLUMSTEAD AND BEXLEY STATION CASE STUDY

H&A Rail’s specialist Brickwork team completed an AFA Scheme, building lift shafts at Plumstead and Bexley stations.

 

From pre-panning meetings this looked like a very challenging project, working within tight conditions and programme constraints.

​

However, by collaboration between all commodities on site, including daily planning and briefings, this project was delivered smoothly,safely, and ahead of programme.

RETAINING WALL PACKAGE WALES & WESTERN ROUTE TORQUAY CASE STUDY

H&A Rail were selected by this tier 1 client to self-deliver works across their retaining wall package.

​

  • Completed 1000m2 of de-vegetation.

  • Supplied and Installed Asset Ba Fix 70 including Strata IT pods – 240m Linear.

  • Supplied and installed 240 linear meters of GRP yellow handrail.

  • Completed 300m2 brickwork repairs.

  • Supplied and installed 350 tonnes of new track ballast.

  • Moved, protected and reinstated 240 linear meters of concrete troughing.

PLATFORM END GATES PACKAGE WESSEX & WESTERN ROUTES CASE STUDY

We were approached by two tier 1 NWR contractors to self-deliver the supply and installation of 55 PEGS across both Wessex and Wales & Western routes.

​

  • Completed the installation of 55 PEGS across 33 stations.

  • Supplied and installed GRP self-closing gates.

  • Supplied and installed circa 100m of GRP fencing across the 33 stations.

  • Supplied and installed 55 anti-trespass mats across 33 stations.

  • Installed yellow cross hatches at all 33 stations.

STICK ON TACTILE CASE STUDY

H&A Rail Ltd completed STICK ON TACTILE Installations over 6 months in 2023 after successfully winning a package of works.

 

Working in collaboration with our key client and valued supply chain we completed all works with no accidents or incidents.

 

A major tranche of works completed, within a set time constraint, and a happy client at the end of the project.

​

  • Protected all platform assets while works took place.

  • Lifted and re-bed 360m of platform tactile.

  • Supplied and Installed 3000 Linear Meters of STICK ON TACTILE.